Check power status, wiring polarity, serial parameters, device address, and terminal resistance in order. For RS485, confirm the A/B line order and that baud rate and parity match the host system.

The published product pages already list common outputs such as 4-20mA and RS485. For direct PLC integration, confirm the input type, power supply, and communication protocol during selection.
Yes, remote upload can be implemented through communication-enabled instruments or a later gateway connection. If the site already has a PLC, RTU, or edge device, integration can usually follow the existing protocol.
Check supply voltage, terminal tightness, range settings, and whether the process medium is within the allowed operating range. If the issue remains, contact service support with the model and site condition.
Provide at least the measured medium, range, process connection, output type, power conditions, and operating environment. For packaged equipment, installation space and interlock requirements are also helpful.
Use a simple sequence of power-on inspection, zero-point confirmation, output verification, and site commissioning. If alarms or control linkage are involved, also verify threshold and hysteresis settings.
The downloads page now supports direct preview and download for common documents. If you need a document that is not yet published, contact us by service email or hotline with the model and request.
Contact us by service hotline or service email, and include the product model, site condition, wiring method, and contact information so the issue can be followed up efficiently.
No matching results found. Try another keyword or contact the service hotline for support.